In Wonder - The World of Splectrum > Engineering > Personas > Public Conscious Persona > Current

Splectrum — Public Conscious Persona 1.0

This page describes how the blog operates as Splectrum’s public conscious persona. The concept is introduced in The Blog as Public Conscious Persona — this page holds the technical detail.

The model

Pipeline

Full pipeline flow diagram

submissions/        — raw material arrives here, uncategorised
                      (surfaced from other repos via Mycelium)
        ↓
    intake          — evaluate, accept or reject
        ↓
drafts/             — accepted, categorised, being worked on
  core/             — substantial Splectrum, building from P1-P5
  research/         — analysing other vocabularies, from Splectrum's position
  thinking/         — small bites, specific insights, mixed
  engineering/      — practical, tools, methods, Splectrum's practice
  commentary/       — reactions, timely, open
        ↓
    production      — structure, write, edit, image, links (collaborative)
        ↓
    scheduling      — compose the blog storyline (autonomous)
        ↓
published/          — date-prefixed, pushed to Blogger

Categories

Categories are modes of engagement, not topics. The same topic can appear in any category.

Category What it is Voice
Core Substantial Splectrum. Building from P1-P5. Splectrum speaking
Research Analysing other vocabularies/traditions. Observing from Splectrum’s position
Thinking Small bites. A specific insight, question, connection. Mix — Splectrum or external or both
Engineering Practical. How we work, tools, methods. Splectrum’s practice
Commentary Reactions to current events, things encountered. Open, responsive

Draft lifecycle

  1. Submission — raw material in submissions/. No post standards required.
  2. Intake — accept or reject. If accepted, categorise.
  3. Categorised — moved to drafts/<category>/. Post storyline laid out.
  4. Draft — full text written, edited, image, links.
  5. Review ready — reviewed, cleaned, ready for scheduling.
  6. Scheduled — published to published/ with date prefix. Pushed to Blogger.

Source of truth

On scheduling, the draft produces its outputs and is then deleted from drafts/. The published file becomes the master.

To update a live post: edit in published/, push to Blogger.

The draft file serves as the workspace during production — containing notes, post prose, page content, tasks, diagram code. On scheduling, it produces: post, reference page(s), vocabulary updates, images. Then it’s done.

Draft frontmatter

---
title: Post title
category: core | research | thinking | engineering | commentary
topic: e.g. ethics, language, Russell, workflow
status: storyline | draft | review-ready | scheduled
---

Scheduling strategy

Baseline

At least one core post per month. That’s the only rigid requirement.

Horizon

Scheduling horizon expands with productivity:

Preferred dates

Composition

Strategic reserve

Core posts are the reserve. When material is plentiful, hold core posts back rather than scheduling immediately. This guarantees the minimum rhythm (1 core/month) even if other sources slow down. Aim: 6-12 months of core posts available in the pipeline at steady state.

Content structure

The persona publishes through three channels:

Posts are moments. Reference pages are where the thinking accumulates. Anchor pages are the navigation between them.

Each post publication may trigger: anchor page update (synopsis when scheduled, full text with links when live), reference page creation or update, search engine indexing.

Scheduling checklist

  1. Render any Mermaid diagrams to images → published/images/ (named with post date prefix)
  2. Upload images to hosting, get URLs
  3. Create clean post file (prose + image refs only, no notes) → published/ with date prefix
  4. Create reference page(s) if any → docs/ with versioned folder structure
  5. Update anchor page(s) on Blogger if needed
  6. Schedule post on Blogger (from published file, not draft)
  7. Add image references to post and page with hosted URLs
  8. Update draft frontmatter status to “scheduled”
  9. Flag tasks from draft in scheduled tasks file
  10. Commit and push
  11. Verify: test all image URLs are accessible, check post and page(s) render correctly on Blogger

Automation roadmap

Role Current Target
Submission Manual Mycelium — seamless cross-repo referencing
Intake Collaborative Autonomous AI
Production Collaborative Stays collaborative — we think and write together
Scheduling Collaborative Autonomous AI

(This page grows as the persona evolves.)


© 2026 In Wonder - The World of Splectrum, Jules ten Bos. The conversation lives at In Wonder - The Conversation.